LAMBORGHINI, UK
As part of an extensive renovation project, the existing workshop area of Lamborghini Leeds was converted into a modern showroom. At the same time, an extension was built to house the new workshop. To keep the business running during the construction phase, a fully equipped interim workshop was set up.
The new workshop is equipped with the latest technology and comprises a total of ten fully equipped workstations. The following lifting solutions are used:
- 3 × Masterlift 2.35 Saa inground swivel arm lifts
- 5 × Masterlift 2.35 NxT Saa inground swivel arm lifts (NxT Generation)
- 1 × MagiX 50-52 Combi WL scissor lift
With its new workshop infrastructure, Lamborghini Leeds is ideally positioned to continue offering the highest level of service in the future.